Skip to main content

Mill House Renovation

Cwm-Y-Felin, Penbryn, Ceredigion – Renovation/Refurbishment
Client – Mr & Mrs Moore.
Duration of work – 8 months.
Status – Main contractor
Project still in progress

Renovation/Refurbishment construction of extensions. Jamson’s ability to deliver a heritage building project was showcased in this historic Mill-House refurbishment. Two extensions were designed to create a larger living space whilst the utmost care was taken to be sympathetic to the existing wood and stonework.

  •  Site clearance
  •  Strip out.
  • Installation of floating glass box extension reaching out over a waterfall.
  • Replacement of all floors.
  •  Installation of bespoke floating staircase.
  •  Extension to the north of the building finished with floor-to-ceiling wraparound glazing and stonework.
  •  All plumbing works, including the installation of a new waste system.
  •  Installation of oil fire central heating system.
  •  Internal doors replaced.
  •  Complete electrical re-wiring including installation of a fire detection system.
  •  Installation of timber windows and doors to external elevation.
  •  Restoration of the waterwheel.
  •  Pointing of the external stonework.
  •  Installation of cantilevered walkway area.
  •  Excavation and formation of retaining walls to form a terraced area in garden.
  •  Installation of new patio.
  •  Installation of new access steps.
  •  Creation of parking area.
  •  Construction of base to receive Shepard’s hut.
  •  Installation of Shepherd’s hut.
  •  Creation of access path to stream.
  •  Installation of sewage treatment package plant.
  • Mill House Renovation
  • Mill House Renovation
  • Mill House Renovation
  • Mill House Renovation